Printer-friendly Version
Submit a comment about this project
KDOT Project No. KA-1003-01
Please include the above project number on all correspondence
K-7 and I-70 Interchange Study



PROJECT DETAILS

Project Web Site
K-7 and I-70 Interchange Project Website

Programmed for Fiscal Year
2013

Location
I-70, Wyandotte County, Northeast KS

Work Type
Preliminary Engineering

Project Description
As recommended in the 2005/2006 K-7 Corridor Management Study, anticipated traffic growth indicates that K-7 will need to be a freeway without traffic signals in the future. Based on this finding, the Kansas Department of Transportation is conducting a more in-depth study of the proposed interchanges at K-7 and I-70, and adjacent interchanges at K-7 and 130th Street and K-7 and Kansas Avenue to verify how the interchange concepts will serve long-range traffic projections. To do this, the study will look at how the on- and off-ramps, associated collector-distributor roads, and through lanes work together so that motorists can safely and easily transfer from one highway to the other or access local roads such as 130th Street and Kansas Avenue.

Project Categories
Category: Major Modification
Subcategory: Interstate Roadway Improvements


Copyright © 2004 Kansas Department of Transportation.
For legal information please read the disclaimer.

Please send any e-mail inquiries about this site to webmaster@ksdot.org
Visit the State of Kansas home page at www.accesskansas.org
|
Kansas Department of Transportation
Dwight D. Eisenhower State Office Building
700 S.W. Harrison Street
Topeka, KS 66603-3754
Phone: (785) 296-3566